Apartments coming right along

We have the floor down in the upstairs and all of the walls in except for the wiring and the drywall.  We decided to put registers in the floor for the heat to come upstairs from the downstairs and you can close them off in the summer and open the vents on the wall to let the cool air in the room.  I just hope the people will do that.  It will save a lot on the electricity.  One of the men from one of the churches is an electrician and he’s donating everything including materials and labor to wire everything.  What a great thing he is doing.

We also have the garage doors off and the walls and doors framed in.  We have already but up the outside walls and have the siding on them along with the front doors installed.   Of course everyone took the weekend off and will be back bright an early Monday morning.  I’m amazed at how fast everything is coming together.